SCADA & HMI Solutions

ICONICS Genesis64 — Engineered for Your Plant Floor

Operator HMI screens, Andon boards, alarm management, and historical trending — designed, scripted, commissioned, and supported by engineers who work in Genesis64 every day.

Control room wall with live production dashboards and Andon displays
GraphWorX64 operator screens · Andon boards
ASSEMBLY LINE 02 · ANDON BOARD --:--:-- SHIFT B · PLAN 480 / ACT 391 LIVE
Screenshot: GraphWorX64 Andon screen — add real capture
Capabilities

What We Deliver in Genesis64

GraphWorX64 screen design

Purpose-built operator screens that follow high-performance HMI principles — status at a glance, alarms impossible to miss, no decoration for its own sake.

  • Operator HMI screens for station and line control
  • Andon boards and large-screen factory floor displays optimized for readability at distance
  • Consistent symbol libraries and navigation models across the plant
  • Multi-resolution layouts for control room, floor displays, and tablets
Design principle

An Andon board is read from 30 meters away in under 2 seconds. Every color, font size, and tile on our screens is chosen for that constraint.

Real-time visualization

Live production intelligence, on screen the moment it happens on the line.

  • Live production dashboards — counts, line status, station states
  • TAKT and OEE displays with plan-vs-actual tracking
  • TrendWorX historical trending for process and performance data
  • AlarmWorX alarm management — priorities, filtering, acknowledgment workflows
Stack
  • GraphWorX64
  • AlarmWorX64
  • TrendWorX64
  • Hyper Historian
  • OPC UA

We configure the full ICONICS visualization stack against your live OPC tags — no mock data, no demo-ware.

Genesis64 engineering

The work behind the screens — the part that decides whether your SCADA is reliable in year three.

  • Code Block scripting and custom logic for station workflows
  • OPC tag management and datasource integration (Kepware, native drivers, SQL)
  • Redundancy planning for servers and data collectors
  • Licensing guidance — sizing the right ICONICS license for your point count and roadmap
Engineering note

Tag architecture decided on day one determines maintenance cost in year five. We document naming conventions, folder structures, and datasource mappings before the first screen is drawn.

Deployment & support

We commission on your plant floor, not from a remote desk — and we harden the system before handover.

  • On-site commissioning alongside your production and maintenance teams
  • HTTPS migration and security hardening for enterprise IT review
  • Operator and maintenance training with as-built documentation
  • Post-go-live support windows aligned to your shift calendar
Handover includes
  • As-built docs
  • Tag database
  • Backup/restore SOP
  • Training sessions
  • Support contract
Next step

Have a Genesis64 Project or an Aging SCADA to Modernize?

We can review your current screens, tags, and licensing and propose a concrete migration or build plan.