Manufacturing Execution Systems That Connect the Shop Floor to the Top Floor
Every part serialized, every station accounted for, every shift reported — automatically. We build MES for high-volume discrete assembly where traceability and performance visibility are non-negotiable.
The Four Pillars of Our MES Delivery
Production tracking & traceability
Know exactly which components went into every serialized unit — across stations and across lines.
- Serialized part tracking from load to unload
- Component genealogy — the digital history card for every unit
- Cross-line component linkage (sub-assembly to final assembly)
- SAP key component booking integration
UNIT : GBX-24A-081847
ST-20 : BRG-LH 7719-A ✓
ST-20 : BRG-RH 7719-B ✓
ST-30 : TORQUE 48.2 Nm ✓
ST-50 : LEAK PASS 0.8 Pa
SAP : BOOKED 261 mvt
Shift & performance management
Shift boundaries handled automatically, performance metrics computed continuously — no manual spreadsheets.
- Shift window management with automated shift reset and boundary handling
- OEE and OLE calculation from live station data
- TAKT time monitoring against plan
- SPR (station performance rate) tracking to find the true bottleneck
SHIFT A : 06:00–14:00
PLAN : 480 ACT: 461
OEE : 84.7%
TAKT : 58s (plan 60s)
BOTTLENECK: ST-30 (SPR 91%)
Production reporting
The right report, in the right inbox, at the right time — without anyone compiling it.
- Automated per-shift production reports
- SSRS reports for traceability, rejects, and downtime analysis
- Scheduled HTML email reports with data tables and charts
- Management dashboards for daily and monthly review
- Shift-end email
- Daily summary
- SSRS drill-down
- Downtime Pareto
- Reject analysis
Reports render as clean HTML email — readable on a phone during the morning review meeting.
Quality & validation
The system enforces the process — wrong part, wrong sequence, or missed checkpoint stops the line before a defect moves on.
- IPQC checkpoint tracking with enforced completion
- Production order validation before station start
- Product genealogy validation at every station
- Poka-yoke station interlocks — e.g., pressing operations with LHS/RHS component validation
- Alerting via messaging webhooks (Google Chat) and email
ST-20 PRESS · CYCLE START
SCAN : BRG-7719-B
EXPECT: RHS BEARING
CHECK : MATCH — PRESS ENABLED
// mismatch → press inhibited,
// Andon CALL + chat alert
Compliance-Grade MES and Material Management
For pharmaceutical, biotech, and other regulated production, the system itself must enforce and evidence compliance — not a binder of SOPs.
21 CFR Part 11 compliance
- Tamper-evident audit trails on critical records and operations
- Electronic signatures with user authentication and role-based access control
- Data integrity aligned to ALCOA+ expectations
- Validation documentation support (IQ/OQ) for audit readiness
Warehouse Management System capabilities
- Inventory tracking integrated with production consumption
- Barcode-driven material movement — receipt, put-away, issue to line
- Location and batch/lot visibility for traceability
- Stock reconciliation reports tied to the same SQL Server backbone
Packaged for Speed, Custom for Fit
Fast deployment, proven scope
A pre-architected MES core deployed and commissioned in weeks, not quarters.
- Serialized production tracking
- Andon board and line dashboards
- Shift management with automated reporting
- OEE/TAKT metrics out of the box
- Standard SQL Server data model
Best for: a first MES on one or two lines, or replacing manual production logs.
Tailored to your process
Designed around your product structure, station logic, and enterprise systems.
- Tailored data model and genealogy structure
- ERP/SAP integration (key component booking, order sync)
- Bespoke workflows — rework loops, quality gates, cross-line linkage
- Custom poka-yoke and interlock logic per station
- Custom reporting suite (SSRS, email, dashboards)
Best for: multi-line plants with traceability audits, ERP integration, and complex assembly logic.
Not Sure Whether You Need Packaged or Custom?
Walk us through your lines and your traceability requirements — we'll tell you honestly which fits.
Explore Connected Capabilities
CerebraQ Automation connects SCADA, MES, industrial connectivity, case studies, FAQs and technical articles into one manufacturing knowledge base.
SCADA Development
Operator screens, alarms, historian trends and ICONICS Genesis64 engineering.
Read moreMES Development
Production tracking, traceability, OEE, ISA-95 alignment and ERP interfaces.
Read moreConnectivity
OPC UA, OPC DA, Kepware, PLC, SQL Server and API integration.
Read moreFAQ
Direct answers about SCADA, MES, OEE, Andon, OPC UA and 21 CFR Part 11.
Read more